New Shed

The new four bay shed project is well underway.

The slab is down, the building erected (two closed, two open bays), most retaining walls in place, tanks installed (about 44,000 litres). Now waiting for final drainage and power to be connected, the site cleaned-up and a load of gravel and screenings to improve the optics.


While the entry and exits to / from the garages are a little tight, it will be fine. Looking forward to getting it all done and the cars locked away in their new 'home'.

Bye for now, BomberBoy